Quote Comparison Checklist
A simple, structured way to compare written proposals for a mini-split installation.

Your project at a glance
Confirm what each quote includes
Check included work and record what each installer has agreed to supply.
| Scope area | What to look for | Quote A | Quote B | Quote C |
|---|---|---|---|---|
| Equipment | What are the indoor and outdoor model numbers, capacities and number of zones? | |||
| Electrical | Does the scope include the circuit, disconnect and any panel work? | |||
| Installation route | What line lengths, covers, mounting and condensate drainage are included? | |||
| Permits & completion | Who obtains applicable permits and what commissioning and handover are included? | |||
| Warranty & support | What is covered for parts, labor and call-out charges? What conditions apply? |
Price drivers to check on each quote
- Local labor market. Compare labor hours and rates, not just totals.
- Electrical circuits and panel work. Confirm whether a dedicated circuit, disconnect, or panel upgrade or subpanel is included.
- Permits and inspections. Confirm who pulls the permit and how many inspections are included.
- Line-set routing and access. Ask for the line-set length, wall penetrations, and access difficulty each bid assumes.
- Number and type of indoor units. Compare bids for the same room list and unit types.
- Installation and commissioning scope. Confirm evacuation, leak testing, condensate drainage, startup, and walkthrough are listed.
These factors explain differences between bids. They do not set a fair price.
The key questions
Use these prompts to review each written proposal.
Equipment
What are the indoor and outdoor model numbers, capacities and number of zones?
Electrical
Does the scope include the circuit, disconnect and any panel work?
Installation route
What line lengths, covers, mounting and condensate drainage are included?
Permits & completion
Who obtains applicable permits and what commissioning and handover are included?
Warranty & support
What is covered for parts, labor and call-out charges? What conditions apply?
Comparison matrix
Fill in the key details from each written proposal.
| Item | Quote A | Quote B | Quote C |
|---|---|---|---|
| Total price ($) | |||
| Equipment models | |||
| Number of zones | |||
| Electrical work | |||
| Permits | |||
| Warranty (parts / labor) | |||
| Notes or exclusions |
Print a copy to keep your entries before leaving this page.